On Monday between 0830 to 1600 there will be a rail train unloading rail between mile 13 and 26.4 on the Holly Sub. They will be occuping both tracks. The last time I saw the rail train he had very nice power a BN GP30 in South Bend.
Norm, I've head it from a CN supervisor that they plan on putting CWR on Main #1 from ROY north to mp21.5 to replace the jointed rail(that's where the jointed stuff ends); what would be nice is they would also replace the jointed rail between Nevada and Clay as this section can get a little rough.