Plymouth & GR sub-div Work

Anything pertaining to railfanning in Michigan.
bluewonderrails
Railroadfan...fan
Posts: 1917
Joined: Fri Sep 25, 2020 12:48 pm

Re: Plymouth & GR sub-div Work

Unread post by bluewonderrails »

Jetlink wrote:
Sat Feb 10, 2024 6:19 pm
There is a sign visible to eastbound trains at Onieda road now. Onieda is the first road crossing just to the west of the City Limits of Grand Ledge. You can also see it from the public grade crossing. I took a cell phone photo of it but struggle to get photo's uploaded on this site from my phone. The code line poles area still standing here but the wires and line are in shambles just hanging and not connected. Any way the sign says:

Entering
Signal Rules
1281-1291
Leaving
Signal Rules
C-1281 - C-1298
Leaving
Signal Rules
TWC - ABS
Got ya here. Took this myself on the 5th
Attachments
CSX Rules shrunken.jpg
Casual railfan who frequents the CN Flint + CSX Plymouth subs

User avatar
David Collins
Youtube Railfan Guru
Posts: 2824
Joined: Fri Sep 25, 2020 10:46 am
Location: Bloomfield Hills, Mi
Contact:

Re: Plymouth & GR sub-div Work

Unread post by David Collins »

I too got a look at the sign. Is it there permanently?
Attachments
IMG_6916.jpeg
Ferris State University’s Train Guy

Youtube: Michigan Railfan Films

Flickr: David R. Collins

SC: daveeed1k

GP30M4216
Saver of all History
Posts: 4832
Joined: Wed Oct 27, 2004 10:35 pm
Location: Feel the Zeel, MI
Contact:

Re: Plymouth & GR sub-div Work

Unread post by GP30M4216 »

David Collins wrote:
Mon Feb 12, 2024 11:54 am
I too got a look at the sign. Is it there permanently?
It will be here until additional signal work takes place moving or eliminating the location where the signal rules change from Chessie to CSX standard.

Semi related- despite having the more modern safetrans type equipment at Ensel, North Lansing and MA, I believe it is (was?) all still using Chessie rules. I wonder how long that will last?

User avatar
SD80MAC
Ingersoll's Mr. Michigan
Posts: 10473
Joined: Thu Mar 10, 2005 4:59 pm
Location: Grand Rapids

Re: Plymouth & GR sub-div Work

Unread post by SD80MAC »

GP30M4216 wrote:
Mon Feb 12, 2024 12:03 pm
David Collins wrote:
Mon Feb 12, 2024 11:54 am
I too got a look at the sign. Is it there permanently?
It will be here until additional signal work takes place moving or eliminating the location where the signal rules change from Chessie to CSX standard.

Semi related- despite having the more modern safetrans type equipment at Ensel, North Lansing and MA, I believe it is (was?) all still using Chessie rules. I wonder how long that will last?
I would guess when the rest of the signals are done, Ensel to MA will be converted to Seaboard rules.
"Remember, 4 mph is a couple, 5's a collision!"
http://flickriver.com/photos/conrail680 ... teresting/
Image

GP30M4216
Saver of all History
Posts: 4832
Joined: Wed Oct 27, 2004 10:35 pm
Location: Feel the Zeel, MI
Contact:

Re: Plymouth & GR sub-div Work

Unread post by GP30M4216 »

SD80MAC wrote:
Fri Feb 09, 2024 9:44 am
Per a bulletin issued by CSX on February 5, the following signals are retired and removed from service: CH 105.2, CH 101.2, CH 99.2, CH 97.8, and CH 95.1. New eastward and westward color light intermediate signals are in service at the following locations: CH 104.3, CH 97.8, and CH 94.2. New eastward and westward absolute signals are in service at NEW control point GRAND LEDGE HOLDOUT at CH 100.8.
The new 94.2 intermediate signal is located at the Ingersoll Road crossing, to the immediate west of the pavement, with a single head facing each direction. I wondered if this relocation might be the case as the previous intermediate located closer to the I-96 bridges was difficult to access.

Signal changes have taken place at Ensel. The Main 1 WAS searchlight signal is gone, as reported elsewhere, replaced with a safetrans installation. The lower head of the EAS is a new signal head, as is the WAS on Main 2. Upper heads are not changed at this time.

User avatar
Saturnalia
Authority on Cat
Posts: 15396
Joined: Wed Sep 28, 2011 7:54 pm
Location: Michigan City, IN
Contact:

Re: Plymouth & GR sub-div Work

Unread post by Saturnalia »

Expect the signals to be typically located at easy to reach locations like at grade crossings. Ain’t nobody got time to hyrail or walk to this stuff!
Thornapple River Rail Series - YouTube
Safety today is your investment for tomorrow

User avatar
Doktor No
Railroadfan...fan
Posts: 1078
Joined: Wed Feb 04, 2015 4:49 pm
Location: Rockford, Michigan

Re: Plymouth & GR sub-div Work

Unread post by Doktor No »

Saturnalia wrote:
Tue Feb 13, 2024 12:22 pm
Expect the signals to be typically located at easy to reach locations like at grade crossings. Ain’t nobody got time to hyrail or walk to this stuff!
Sometimes railroad logic actually makes some sense.
Curb Your Enthusiasm.

User avatar
MQT1223
O Scale Railfanner
Posts: 4073
Joined: Wed Sep 10, 2014 1:46 pm
Location: Grandville, Michigan
Contact:

Re: Plymouth & GR sub-div Work

Unread post by MQT1223 »

Things to note as I chased 303 today and did some reconnaissance at some of the new locations.

There is a pair of new signals at Lawson Rd (100.77?). Both masts have two heads, three aspects on the upper and two on the bottom. The relay case said “Grand Ledge Holdout”. What is the purpose of this signal when there isn’t a control point? I can understand why you’d need at EB holdout but why a WB?

Also, there are no signals at the west end of the siding in Grand Ledge still but the new bungalow is installed and there are two brand new powered switch machines installed, with the one on the siding towards the Grand Ledge Industrial Track having a hand throw option. This to me would indicate that CSX is going to make this a proper control point for meets. The old hand throws are in a pile by the warehouse across the ROW. Making Grand Ledge a siding to conduct meets would make sense since Sunfield is no more.

The East end of Grand Ledge has a new signal up but it’s currently just one head on a single mast facing each direction like the new set up at the DD (104.3) at Mulliken. Not sure if this is a temporary setup or if they plan on putting up additional masts once the signals at the west end are done. Whenever I’ve seen control points on CSX they have a signal for each track with heads facing either direction, but this looks more like an intermediate signal style set up.
1223 OUT! President and Founder of the Buck Creek Central, the Rolling River Route! (2012-2017) President and Founder of the Lamberton Valley Railroad, The Tin Plate Road! Proudly railfanning with Asperger's since 1996. :)

User avatar
DaveO
Read more, think more, post less
Posts: 1464
Joined: Thu Dec 14, 2017 12:57 pm
Location: Between here and there

Re: Plymouth & GR sub-div Work

Unread post by DaveO »

MQT1223 wrote:
Sun Mar 03, 2024 3:05 pm

There is a pair of new signals at Lawson Rd (100.77?). Both masts have two heads, three aspects on the upper and two on the bottom. The relay case said “Grand Ledge Holdout”. What is the purpose of this signal when there isn’t a control point? I can understand why you’d need at EB holdout but why a WB?
By your description, it is now a control point.
It now joins the CN signals at Lawson on the Flint Sub and Raven on the Holly Sub.

User avatar
MQT1223
O Scale Railfanner
Posts: 4073
Joined: Wed Sep 10, 2014 1:46 pm
Location: Grandville, Michigan
Contact:

Re: Plymouth & GR sub-div Work

Unread post by MQT1223 »

DaveO wrote:
Sun Mar 03, 2024 3:25 pm
MQT1223 wrote:
Sun Mar 03, 2024 3:05 pm

There is a pair of new signals at Lawson Rd (100.77?). Both masts have two heads, three aspects on the upper and two on the bottom. The relay case said “Grand Ledge Holdout”. What is the purpose of this signal when there isn’t a control point? I can understand why you’d need at EB holdout but why a WB?
By your description, it is now a control point.
It now joins the CN signals at Lawson on the Flint Sub and Raven on the Holly Sub.
What does CN have to do with any of this???
1223 OUT! President and Founder of the Buck Creek Central, the Rolling River Route! (2012-2017) President and Founder of the Lamberton Valley Railroad, The Tin Plate Road! Proudly railfanning with Asperger's since 1996. :)

User avatar
DaveO
Read more, think more, post less
Posts: 1464
Joined: Thu Dec 14, 2017 12:57 pm
Location: Between here and there

Re: Plymouth & GR sub-div Work

Unread post by DaveO »

MQT1223 wrote:
Sun Mar 03, 2024 3:29 pm
DaveO wrote:
Sun Mar 03, 2024 3:25 pm
MQT1223 wrote:
Sun Mar 03, 2024 3:05 pm

There is a pair of new signals at Lawson Rd (100.77?). Both masts have two heads, three aspects on the upper and two on the bottom. The relay case said “Grand Ledge Holdout”. What is the purpose of this signal when there isn’t a control point? I can understand why you’d need at EB holdout but why a WB?
By your description, it is now a control point.
It now joins the CN signals at Lawson on the Flint Sub and Raven on the Holly Sub.
What does CN have to do with any of this???
They are also hold-out signals. So not a new scenario in Michigan.

User avatar
SD80MAC
Ingersoll's Mr. Michigan
Posts: 10473
Joined: Thu Mar 10, 2005 4:59 pm
Location: Grand Rapids

Re: Plymouth & GR sub-div Work

Unread post by SD80MAC »

Not even a new scenario on CSX. Joy Holdout was an absolute in Michigan City for years.
"Remember, 4 mph is a couple, 5's a collision!"
http://flickriver.com/photos/conrail680 ... teresting/
Image

User avatar
SD80MAC
Ingersoll's Mr. Michigan
Posts: 10473
Joined: Thu Mar 10, 2005 4:59 pm
Location: Grand Rapids

Re: Plymouth & GR sub-div Work

Unread post by SD80MAC »

Grand Ledge siding is no longer going to be designated as a siding in the timetable, it will just be an "other than main/yard" track, with hand throw switches. Expect either or just one end of the siding to have just an intermediate signal. The thinking behind putting an absolute signal west of town is that the dispatcher can hold an eastbound train there if a grain train or local is working.
Last edited by SD80MAC on Tue Mar 05, 2024 9:06 am, edited 1 time in total.
"Remember, 4 mph is a couple, 5's a collision!"
http://flickriver.com/photos/conrail680 ... teresting/
Image

User avatar
MQT1223
O Scale Railfanner
Posts: 4073
Joined: Wed Sep 10, 2014 1:46 pm
Location: Grandville, Michigan
Contact:

Re: Plymouth & GR sub-div Work

Unread post by MQT1223 »

SD80MAC wrote:
Mon Mar 04, 2024 4:03 pm
Grand Ledge siding is no longer going to be designated as a siding in the timetable, it will just be an "other than main/yard" track, with hand throw switches. Expect either end of the siding to have just an intermediate signal. The thinking behind putting an absolute signal west of town is that the dispatcher can hold an eastbound train there if a grain train or local is working.
Does not appear there will be a signal on the east end of the siding.

I don't understand this move, since Grand Ledge is one of the biggest sidings between Seymour and Ensel that's still intact and yet its not set up for meets. I get that they don't happen on this part of the railroad much, but it seems like having the option would be nice. Maybe someone would put Sunfield back in one day?
1223 OUT! President and Founder of the Buck Creek Central, the Rolling River Route! (2012-2017) President and Founder of the Lamberton Valley Railroad, The Tin Plate Road! Proudly railfanning with Asperger's since 1996. :)

User avatar
kd_1014
Mike
Posts: 1064
Joined: Sat Feb 24, 2018 3:29 pm
Location: Creston, Grand Rapids

Re: Plymouth & GR sub-div Work

Unread post by kd_1014 »

MQT1223 wrote:
Mon Mar 04, 2024 9:07 pm
SD80MAC wrote:
Mon Mar 04, 2024 4:03 pm
Grand Ledge siding is no longer going to be designated as a siding in the timetable, it will just be an "other than main/yard" track, with hand throw switches. Expect either end of the siding to have just an intermediate signal. The thinking behind putting an absolute signal west of town is that the dispatcher can hold an eastbound train there if a grain train or local is working.
Does not appear there will be a signal on the east end of the siding.

I don't understand this move, since Grand Ledge is one of the biggest sidings between Seymour and Ensel that's still intact and yet its not set up for meets. I get that they don't happen on this part of the railroad much, but it seems like having the option would be nice. Maybe someone would put Sunfield back in one day?
I mean, it’s still THERE. Not ripped out. So meets COULD happen. They just don’t need the infrastructure for conducting multiple meets for the 3 (MAYBE 4) trains that go thru there in a 24 hour period.

User avatar
SD80MAC
Ingersoll's Mr. Michigan
Posts: 10473
Joined: Thu Mar 10, 2005 4:59 pm
Location: Grand Rapids

Re: Plymouth & GR sub-div Work

Unread post by SD80MAC »

Correct, there's nothing that says the siding can't still be used for meets. T&E wanted power switches but engineering did not, and engineering won.
"Remember, 4 mph is a couple, 5's a collision!"
http://flickriver.com/photos/conrail680 ... teresting/
Image

User avatar
amessmann
Signal Maintainer
Posts: 1512
Joined: Tue Nov 10, 2020 4:58 pm
Location: East Lansing, MI

Re: Plymouth & GR sub-div Work

Unread post by amessmann »

Pictures are going around of new conduit installed at WE Williamston which is similar to those I took pictures of in Grand Ledge last fall. Multiple runs of orange flexible conduit stick out near the WAS for the main track, and a single conduit sticks out on the other side of the tracks. If you look closely at the WE bungalow in the distance, it looks like two others stick out of the ground. Comments on the Facebook post mention a fiber buildout in town, but the proximity to the tracks makes me think otherwise. https://www.facebook.com/photo?fbid=767 ... 8785558784 I will take some pictures myself when I pass through the area next.

User avatar
C&O Dispatcher
Railroadfan...fan
Posts: 261
Joined: Tue Jun 10, 2008 6:02 pm

Re: Plymouth & GR sub-div Work

Unread post by C&O Dispatcher »

SD80MAC wrote:
Mon Mar 04, 2024 9:22 am
Not even a new scenario on CSX. Joy Holdout was an absolute in Michigan City for years.
Although obviously not installed by CSX, we had absolute "hold out" signals in several places: Scottville; just east of Baldwin (so a train like ML18 didn't have to run restricted speed for several miles toward Olivers), Blocks 1-2-3 at Midland-Dean, Grand Blanc (prior to the siding getting power switches and new signals), N. Holly, S. Holly and 7 Mile Road north of Plymouth. Remember though, don't make a meet at any one of them!! :D

matt76
Railroadfan...fan
Posts: 49
Joined: Sat Jan 17, 2015 5:57 pm

Re: Plymouth & GR sub-div Work

Unread post by matt76 »

I was in Williamston last week and saw that they were running conduit for new signals. This was the only spot that I saw this being done between there and Howell. I wanna make another trip up there next month and will post any updates.

User avatar
TSS
Railroadfan...fan
Posts: 373
Joined: Sat Apr 15, 2017 8:58 pm
Location: Saint Joseph, MI

Re: Plymouth & GR sub-div Work

Unread post by TSS »

Is any tie work happening on the Plymouth, or are all the ties going to the GR sub side?

Post Reply