I have a question. I have not driven Chicago Dr from Grandville to GR in a long time (about 15 years I'd guess).
When I used to be in the area, there was a line running from the CSX main across Viaduct St and into a building (Now Jireh Metal / Padnos). There was nothing else in that vicinity. Now I see what appears to be a very active transload location next to this.
When did the line from the main into the building and behind get pulled out, and when did the transload (cement) get installed?
CSX West of Grand Rapids
- SD80MAC
- Ingersoll's Mr. Michigan
- Posts: 10469
- Joined: Thu Mar 10, 2005 4:59 pm
- Location: Grand Rapids
Re: CSX West of Grand Rapids
That's Buzzi Unicem Cement's Grandville terminal. That switch was installed in 2015-2016 I believe. The spur into the old Padnos building (at least the switch and the part that crossed Viaduct St) was removed a few years prior to that.
"Remember, 4 mph is a couple, 5's a collision!"
http://flickriver.com/photos/conrail680 ... teresting/
http://flickriver.com/photos/conrail680 ... teresting/