Porter Junction rail project finally gets green light

Anything pertaining to railfanning in Indiana.
User avatar
justalurker66
Railroadfan...fan
Posts: 1964
Joined: Tue Feb 15, 2011 2:51 am

Re: Porter Junction rail project finally gets green light

Unread post by justalurker66 »

It is interesting that even signals where the next signal is an intermediate (CP 490 EB, CP 487 WB, CP 507 WB 1 and 2) have a third head.

BTW: CP 498 on Pine Siding (under construction) has two heads in both directions (cantilever EB, mast WB).

User avatar
justin_gram
Authority on Rabbit
Posts: 4649
Joined: Mon Dec 30, 2013 6:45 pm
Location: St. Joseph CG91.9 / East Lansing CH87
Contact:

Re: Porter Junction rail project finally gets green light

Unread post by justin_gram »

Any new word from the new CP 498 and CP 500 construction?

LakeATCS
Railroadfan...fan
Posts: 625
Joined: Sat Feb 28, 2015 5:37 am

Re: Porter Junction rail project finally gets green light

Unread post by LakeATCS »

Test addresses flying around.

Suspected Chicago Line test addresses
75508800070202 56 bit BCP, 80 bit MCP. Most likely the new CP 501 8 switch bits.
75508800170202 64 bit BCP, 96 bit MCP. Big sucker. 017 code line address would perhaps match up with CP 502? It is 64 and 80 right now. 6 switch bits. Did not know a new CP502 was in the works.
75508800210202 32 bit MCP, no BCP broadcasts yet. Probably 500
75508800220202 24 bit MCP, no BCP broadcasts yet. Probably 498

That doesn't even include the Lake stuff flying around today.

LakeATCS
Railroadfan...fan
Posts: 625
Joined: Sat Feb 28, 2015 5:37 am

Re: Porter Junction rail project finally gets green light

Unread post by LakeATCS »

Next steps.

Effective 3:01 A.M., Tuesday, 07-26-16, the following
signal changes will be placed in service.

Retire the existing 4991E, 4991W, 4992E and 4992W
signals located at MP CD 499.1 in its entirety.

New Westward 4981W and 4982W Signals located at on a cantilever mast at MP CD 498.8
New Westward 4981E and 4982E Signals located at on a cantilever mast at MP CD 498.8

Electric Lock Mechanism has been installed at the following locations The approach locking has been removed and will be time locking only.

1. East End Pine Yard switch located on Main 1 Track,
Mile Post CD 499.1 Predetermined Time Interval Time 9 Min. 15 Sec.
1. West End Pine Yard switch located on Main 1 Track,
Mile Post CD 500.1 Predetermined Time Interval Time 12 Min. 06 Sec.

I am guessing this gets the existing intermediates out of the way.

User avatar
justin_gram
Authority on Rabbit
Posts: 4649
Joined: Mon Dec 30, 2013 6:45 pm
Location: St. Joseph CG91.9 / East Lansing CH87
Contact:

Re: Porter Junction rail project finally gets green light

Unread post by justin_gram »

It's neat watching some of these moves! This is Chicago West clearing the way for Amtrak 48, who is on main 1 in the first picture.
Attachments
First
First
Screenshot (180)fix.png (5.8 KiB) Viewed 11757 times
A few moments later
A few moments later
Screenshot (181)fix.png (5.79 KiB) Viewed 11757 times

tttodisp
Railroadfan...fan
Posts: 197
Joined: Sun Nov 30, 2014 8:13 pm

Re: Porter Junction rail project finally gets green light

Unread post by tttodisp »

LakeATCS wrote:Next steps.

Effective 3:01 A.M., Tuesday, 07-26-16, the following
signal changes will be placed in service.

Retire the existing 4991E, 4991W, 4992E and 4992W
signals located at MP CD 499.1 in its entirety.

New Westward 4981W and 4982W Signals located at on a cantilever mast at MP CD 498.8
New Westward 4981E and 4982E Signals located at on a cantilever mast at MP CD 498.8

Electric Lock Mechanism has been installed at the following locations The approach locking has been removed and will be time locking only.

1. East End Pine Yard switch located on Main 1 Track,
Mile Post CD 499.1 Predetermined Time Interval Time 9 Min. 15 Sec.
1. West End Pine Yard switch located on Main 1 Track,
Mile Post CD 500.1 Predetermined Time Interval Time 12 Min. 06 Sec.

I am guessing this gets the existing intermediates out of the way.
All that they have to do next is to add/activate the EBCS for the Pine Siding track to that cantilever for CP 499 operation.

User avatar
justalurker66
Railroadfan...fan
Posts: 1964
Joined: Tue Feb 15, 2011 2:51 am

Re: Porter Junction rail project finally gets green light

Unread post by justalurker66 »

LakeATCS wrote:I am guessing this gets the existing intermediates out of the way.
It should. 4991E/W would be in the way of the new siding extension.

It will be interesting to see when 501 goes live and 497 starts sending trains to Pine Yard instead of the old manual switch.
502 received new signals separately from Indiana Gateway. I'd like to see the code reworked for 503 as well.

LakeATCS
Railroadfan...fan
Posts: 625
Joined: Sat Feb 28, 2015 5:37 am

Re: Porter Junction rail project finally gets green light

Unread post by LakeATCS »

Yeah the new 502 is a surprise. Probably should start a new thread for that, or put it in our Chicago Line PTC thread.

LakeATCS
Railroadfan...fan
Posts: 625
Joined: Sat Feb 28, 2015 5:37 am

Re: Porter Junction rail project finally gets green light

Unread post by LakeATCS »

12:01 p.m., Wednesday, 08-03-16

Retire the existing Electric Lock at CD 500.1 in its
entirety located at MP CD 500.1

CP 500 at MP CD 500.1

#1 power crossover has been installed at MP CD 500.2,
for Eastward movements from the Pine Siding Track to the
Pine Yard Track

4E Home Signal located to the left of the
Pine Siding Track on a high mast

2E Home Signal located to the left of the
Pine Stub Track on a Dwarf signal

4W Home Signal located to the left of the
Pine Siding Track on a High Signal mas

2W Home Signal located to the right of
the Pine Yard Track on a high mast

LakeATCS
Railroadfan...fan
Posts: 625
Joined: Sat Feb 28, 2015 5:37 am

Re: Porter Junction rail project finally gets green light

Unread post by LakeATCS »

12:30 a.m., Sunday, 07-31-16

New Controlled Point CP 501 at MP CD 501.1

#15 power switch has been installed at MP CD 501.1, for Westward movements from the Main 1 Track to the Main 3 Track.

#13 power switch has been installed at MP CD 501.2, for Eastward movements from the Main 1 Track to the Pine Siding Track.

#11 power crossover has been installed at MP CD 501.2, for Eastward movements from the Main 3 Track to the Main 2 Track.

#9 power switch has been installed at MP CD 501.2, for Eastward movements from the Main 2 Track to the Ft Wayne Secondary Track.

#7 power switch has been installed at MP CD 501.2, for Westward movements from the Main 2 Track to the Main 4 Track.

#5 power crossover has been installed at MP CD 501.4, for Westward movements from the Main 1 Track to the Main 3 Track.

#3 power crossover has been installed at MP CD 501.4, for Westward movements from the Main 2 Track to the Main 3 Track.

#1 power crossover has been installed at MP CD 501.5, for Westward movements from the Main 3 Track to the Main 1 Track.

2W Signal located over and to the right of the Pine Siding track on a cantilever mast signal
4W Signal located over and to the right of the Main 1 track on a cantilever mast
8W Signal located over and to the right of the Main 2 track on a cantilever mast
10W Home Signal located to the right of the Ft Wayne Secondary Track on a High signal mast at MP CD 501.1.

2E Signal located over and to the right of the Main 1 track on a bridge mast at MP CD 501.6
6E Signal located over and to the right of the Main 3 track on a bridge mast at MP CD 501.6
10EA Signal located over and to the right of the Main 2 track on a bridge mast at MP CD 501.6
10ED Signal located over and to the right of the Main 4 track on a bridge mast

User avatar
justalurker66
Railroadfan...fan
Posts: 1964
Joined: Tue Feb 15, 2011 2:51 am

Re: Porter Junction rail project finally gets green light

Unread post by justalurker66 »

Thank you for the updates ... It is interesting to see that they are keeping the 1 3 2 4 track numbering.

LakeATCS
Railroadfan...fan
Posts: 625
Joined: Sat Feb 28, 2015 5:37 am

Re: Porter Junction rail project finally gets green light

Unread post by LakeATCS »

Show shut off time for 501(446) at 22:10 hours

Guess they started a bit early. Traffic does look a bit light. But just as I say that. Here comes an Amtrak

LakeATCS
Railroadfan...fan
Posts: 625
Joined: Sat Feb 28, 2015 5:37 am

Re: Porter Junction rail project finally gets green light

Unread post by LakeATCS »

LakeATCS wrote:Show shut off time for 501(446) at 22:10 hours

Guess they started a bit early. Traffic does look a bit light. But just as I say that. Here comes an Amtrak
New CP 501 is up and broadcasting 24 seconds after midnight.

User avatar
justalurker66
Railroadfan...fan
Posts: 1964
Joined: Tue Feb 15, 2011 2:51 am

Re: Porter Junction rail project finally gets green light

Unread post by justalurker66 »

LakeATCS wrote:Suspected Chicago Line test addresses
75508800070202 56 bit BCP, 80 bit MCP. Most likely the new CP 501 8 switch bits.
75508800170202 64 bit BCP, 96 bit MCP. Big sucker. 017 code line address would perhaps match up with CP 502? It is 64 and 80 right now. 6 switch bits. Did not know a new CP502 was in the works.
75508800210202 32 bit MCP, no BCP broadcasts yet. Probably 500
75508800220202 24 bit MCP, no BCP broadcasts yet. Probably 498
New CP 501 turned out to be 80 bits
New CP 502 turned out to be 96 bits
(Reusing old addresses at both locations.)

Staying tuned for CP 500 later this week.


CP 501 turned out interesting. I have not figured out all of the bits, but I believe I have the switches, signals, TK segments, switch locks, OOS and approaches. I was surprised by the number of TK segments ... five would have been a minimum. But I see eight TKs active. The OOS bits are a nice addition.

LakeATCS
Railroadfan...fan
Posts: 625
Joined: Sat Feb 28, 2015 5:37 am

Re: Porter Junction rail project finally gets green light

Unread post by LakeATCS »

Well surprise surprise. 500 and 498 came on around 8am this morning.

No bits are changing, so I suspect with them being on an OOS lead, they get configured in a more leisurely manner.

User avatar
justalurker66
Railroadfan...fan
Posts: 1964
Joined: Tue Feb 15, 2011 2:51 am

Re: Porter Junction rail project finally gets green light

Unread post by justalurker66 »

They might as well test the radios.

LakeATCS
Railroadfan...fan
Posts: 625
Joined: Sat Feb 28, 2015 5:37 am

Re: Porter Junction rail project finally gets green light

Unread post by LakeATCS »

Must be doing track work up there. The pine leads off 501 and 497 are shunting off and on today.

But no corresponding bits change at 498 and 500. I am guessing the radios are on, the interlocking is running, but the wires are not connecting to anything yet.

LakeATCS
Railroadfan...fan
Posts: 625
Joined: Sat Feb 28, 2015 5:37 am

Re: Porter Junction rail project finally gets green light

Unread post by LakeATCS »

For some reason there is a second CP 500 notice.

12:01 p.m., Wednesday, 08-03-16 (note that is NOON tomorrow, not midnight tonight)

Retire the existing Electric Lock at CD500.1 in its
entirety located at MP CD 500.1

Speed
Track speed in the new Pine Siding between
CP 500 and CP 501 is 40mph Freight and 45mph Passenger

CP 500 at MP CD 500.1

#1 power crossover has been installed at MP CD 500.2, for Eastward movements from the Pine Siding Track to the Pine Yard Track.

2E Home Signal located to the left of the Pine Stub Track on a Dwarf signal at MP CD 500.2
4E Home Signal located to the left of the Pine Siding Track on a high mast at MP CD 500.2.
2W Home Signal located to the right of the Pine Yard Track on a high mast at MP CD 500.1.
4W Home Signal located to the left of the Pine Siding Track on a High Signal mast at MP CD 500.1

LakeATCS
Railroadfan...fan
Posts: 625
Joined: Sat Feb 28, 2015 5:37 am

Re: Porter Junction rail project finally gets green light

Unread post by LakeATCS »

Looks like someone is connecting stuff at CP 500.

User avatar
justalurker66
Railroadfan...fan
Posts: 1964
Joined: Tue Feb 15, 2011 2:51 am

Re: Porter Junction rail project finally gets green light

Unread post by justalurker66 »

LakeATCS wrote:Speed
Track speed in the new Pine Siding between CP 500 and CP 501 is 40mph Freight and 45mph Passenger
That seems to be the addition. The track work must have been successful.

It will be interesting to see how much traffic Pine Yard gets, now that we can see both ends on NS (and not have to try to guess from disappearing and appearing trains).