A crew was out removing the signals at the M-5 crossing yesterday. They started with the overhead signals and by mid-afternoon, had most of the crossing signals down. I read somewhere that the tracks are going to be removed and the crossing paved over at some point soon.
-
- Railroadfan...fan
- Posts: 183
- Joined: Fri Jan 27, 2012 5:32 pm
- Location: Novi, Michigan
Re: Working on the MAL
The track in the crossings at M-5 are finally being removed. They're demoing the concrete on either side of the tracks too. It will probably take a week or so for all that work to be completed based on the current pace of construction.